ALGERIA: ORAN TRAMWAY

Customer

Entreprise Metro d'Alger (EMA)

Subsystem

Duration of the project

2007 to 2013

Project's description

Our Service

  • Global coherence, system approach
  • Operation of tramways
  • External risks, natural risks and technological risks
  • Command and control, railway signalling
  • Civil engineering -Solidity
  • Platform, track and switches and crossings
  • Traction energy, 11 substations including 1 in depot
  • Rolling stock: 30 Citadis 302 trainsets
  • Urban integration
  • 32 stations including 4 interconnections, cameras at intersections

CERTIFER team
1 project manager and 10 experts