FRANCE: HIGH SPEED LINE EAST PHASE 1

Customer

RFF

Subsystem

Duration of the project

2002 to 2008

Project's description

Control and signalling (ERTMS Level 2 equipment, SEI equipment, KVB, track circuits…)
Energy (voltage/frequency, interface with substations…)
Infrastructure
Structures (Covered trenches, Viaducts, station platforms, bridges,…)
Track (risk of derailment)
Interfaces with rolling stock (crosswinds, hot box detectors, etc.)
Detection equipment (fall detectors,…)
Provisions relating to the protection of the site
Operation and maintenance

Scope of work