METRO LINES 3 AND 6 OF SANTIAGO DE CHILE

Customer

METRO DE SANTIAGO

Subsystem

Global System

Duration of the project

2012 - 2018

Project's description

METRO DE SANTIAGO is the client and is working with different stakeholders in order to build the two new metro lines in Santiago: lines 3 and 6.

CERTIFER is in charge of the Independent Safety Assessment and Audit of the safety aspects for both lines including:

  • Global System,
  • Operation & Maintenance,
  • Command & Control & Signalling,
  • Rolling Stock,
  • Catenary,
  • Energy,
  • Tracks,
  • Platform doors,
  • Control Center,
  • Safety systems in tunnels (fire detection system, ventilation system, evacuation equipment),
  • Interfaces between subsystems,
  • Risks exported to the operator and maintainer,
  • Interfaces with Civil Engineering.