ITALY: BL3 ON BOARD HOMOLOGATION ON TRACK MACHINE
Cliente
New Sorema Ferroviaria
Sottosistema
Durata del progetto
2016 - 2017
Descrizione del progetto
In order to obtain by ANSF the AMIS to be able to circulate on the national network not in the interruption condition, the On truck Machine manufacturers must provide for a STB system compatible with the track-side signaling system.
Ambito di lavoro
VIS activities for the homologation of the rolling stocks equipped with on board BL3 system according to the ANSF Guidelines 2/2013.
Risultati
Vedi tutto